Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #751
    UTJS-1
    Member

    hi, dear challenge team,
    The dataset of T6 had been changed, while the ScoringSpreadsheet is the same as before.
    i hope the sheet will be updated.
    THANKS~

    #755
    kjd02002
    Moderator

    Dear UTJS-1,

    The penalty score is fully defined in the “penalty score” tab of https://www.phmdata.org/2019datachallenge/

    The T6 training data includes the actual crack lengths so you may use the penalty score definition to calculate all scores. The ScoringSpreadsheet was provided as a helpful guide, but is not required to calculate your own score. Please note, the ScoringSpreadsheet that is available for download contains an error with the monotonicity penalty function. The spreadsheet incorrectly uses m = 100 instead of m = 10. Please reference: https://www.phmdata.org/forums/topic/factor-m-in-monotonic-penalty-function/

Viewing 2 posts - 1 through 2 (of 2 total)
  • The forum ‘2019 Data Challenge: Technical Questions’ is closed to new topics and replies.